
Then bring in the new...

Then it was time to get to it - strip the walls bare, down to the foundation, and rebuild them where necessary, wall filler everywhere, and then base coat, wall filler, and 2 coats of paint. 2 coats of white paint for the ceiling too. Prep time: 10 days. Final paint job: 2 days.
Sanding the walls before and after wall filler is no joke

Pain in de arse but must be done.



DSL broadband connection. Not pretty but it works.

Everything removed from the closet...

New colour scheme.

More pictures soon.
0 comments:
Post a Comment